"Karvan-Yevlax" has started work on the reserve pitch after the renovation of the main pitch and the construction of the dormitory.
According to Idman.Biz, referring to sportinfo.az, equipment has already been brought to the area, and active reconstruction has begun.
The renovated reserve pitch will meet the requirements for hosting official matches.
The pitch will have a natural surface. Stands with a capacity of 1500-2000 people will be built around it.
Administrative and changing rooms will be built under the stands.